
Element 150
Casement Wall System

Experience smooth, effortless operation as your casement windows open outward to capture a full, natural breeze. Perfect for sunrooms, living rooms, kitchens, and bedrooms that connect to outdoor spaces. Designed to bring the outdoors in while maintaining excellent energy efficiency and thermal comfort when closed.
water proof
Heat Insulation
Prevent Mist
Airtightness
Sound Lock
Wind
Resistance
Detailed Images



Product Features
Slim Frames Interior and Exterior, Overall Simple and Aesthetic.
Thermal Multi-Chamber Structure, Excellent Soundproofing and Thermal
Insulation.
Concealed Drainage, Engineered to Prevent Leakage
Composite Sealing Strips, Better Air Tightness and Water Tightness.
Thermal barrier system for reduced thermal conductivity and increased energy efficiency.
6 mm Double Glass Higher insulation reduce sound
High quality corner clips
connections
European Handel for Modern Look
Specialty Glass Options

FROSTED

OBSCURE

BLACK TINT

GRAY TINT
Color
Premium Black
Pure White
Vintage Brown
Classic Grey
Luxury Silver

Teak Wood
Technical parameters
|
Profile Thickness (in) |
Glass Thickness (in) |
Sightline Width – Interior (in) |
Sightline Width – Exterior (in) |
|
|---|---|---|---|---|
|
150 Frame |
0.071 |
1.220 |
1.811 |
0.866 |
|
150 Mullion |
0.071 |
1.220 |
2.756 |
0.866 |
|
Window Sash |
0.079 |
1.220 |
0.945 |
1.535 |
|
Retro Window Sash |
0.118 |
1.181 |
0.709 |
1.535 |
screens
Engineered for crank-operated, push-out, and automated ViewLux casement and awning window configurations.

Screens Features
1. Slim screen frame designed to preserve sightlines and maximize daylight openings
2. Optional retractable screen system for swinging and multi-slide doors, featuring high-transparency mesh for unobstructed views
3. Premium high-visibility mesh for enhanced clarity and airflow
4. Sliding screen option available for sliding door systems, engineered for smooth operation and durability
5. Innovative latch system with interior color-matched finish for a clean, cohesive look
