
Element 150
Swing Door Wall System

Effortlessly swing your new doors open to create a wide, welcoming passage between indoors and out. Ideal for living rooms, dining areas, and spaces that open onto outdoor patios. Enjoy seamless access and natural light without compromising energy efficiency or thermal comfort when closed.
water proof
Heat Insulation
Prevent Mist
Airtightness
Sound Lock
Wind
Resistance
Detailed Images



Product Features
Features Partition and Insulation Design, Wind Pressure Resistance, Excellent Soundproofing and Thermal Insulation.
Thermal Break Aluminum Frame With polyamide thermal break system To enhances
insulation by reducing heat transfer.
3-Point Locking System enhanced security by Locking the door at multiple points
along the frame.
High-Quality Weather Strips for Superior Sealing improves insulation, preventing air
and water infiltration, which enhances overall energy efficiency and durability.
Adjustable Hinges for Smooth Operation for precise alignment and flexibility, the
adjustable hinges ensure smooth opening and closing.
High Security Euro profile Deadbolt
Stainless Steel Hinges
European Handel for Modern Look
Specialty Glass Options

FROSTED

OBSCURE

BLACK TINT

GRAY TINT
Color
Premium Black
Pure White
Vintage Brown
Classic Grey
Luxury Silver

Teak Wood
Technical parameters
|
Profile Thickness (in) |
Glass Thickness (in) |
Sightline Width – Interior (in) |
Sightline Width – Exterior (in) |
|
|---|---|---|---|---|
|
150 Frame |
0.071 |
1.220 |
1.811 |
0.866 |
|
150 Mullion |
0.071 |
1.220 |
2.756 |
0.866 |
|
Door Sash |
0.118 |
1.220 |
0.709 |
1.535 |
|
Retro Door Sash |
0.118 |
1.220 |
0.945 |
1.535 |
|
Low Threshold |
0.071 |
0.945 |
0.394 |
screens
Retractable screens are available for Modern Swinging doors and Multi-Slide doors. A sliding screen is available for the Modern Sliding door.

Screens Features
1. Slim screen frame designed to preserve sightlines and maximize daylight openings
2. Optional retractable screen system for swinging and multi-slide doors, featuring high-transparency mesh for unobstructed views
3. Premium high-visibility mesh for enhanced clarity and airflow
4. Sliding screen option available for sliding door systems, engineered for smooth operation and durability
5. Innovative latch system with interior color-matched finish for a clean, cohesive look
sills
Every detail of the ViewLux system is thoughtfully engineered, including the sill design. We offer flush sill options for both mild and demanding weather conditions, as well as a performance sill solution for applications where a recessed installation is not feasible.

Swinging Options

Low profile Threshold

