Element 88

Swing Door

Effortlessly swing your new doors open to create a wide, welcoming passage between indoors and out. Ideal for living rooms, dining areas, and spaces that open onto outdoor patios. Enjoy seamless access and natural light without compromising energy efficiency or thermal comfort when closed.

water proof
Heat Insulation
Prevent Mist
Airtightness
Sound Lock
Wind
Resistance

Detailed Images

Product Features

Features Partition and Insulation Design, Wind Pressure Resistance, Excellent Soundproofing and Thermal Insulation.

Thermal Break Aluminum Frame With polyamide thermal break system To enhances
insulation by reducing heat transfer.

3-Point Locking System enhanced security by Locking the door at multiple points
along the frame.

High-Quality Weather Strips for Superior Sealing improves insulation, preventing air
and water infiltration, which enhances overall energy efficiency and durability.

Adjustable Hinges for Smooth Operation for precise alignment and flexibility, the
adjustable hinges ensure smooth opening and closing.

High Security Euro profile Deadbolt

Stainless Steel Hinges

European Handel for Modern Look

Specialty Glass Options

FROSTED

OBSCURE

BLACK TINT

GRAY TINT

Color

Premium Black

Pure White

Vintage Brown

Classic Grey

Luxury Silver

Teak Wood

Technical parameters

Profile Thickness (in)

Glass Thickness (in)

Sightline Width – Interior (in)

Sightline Width – Exterior (in)

88 Frame

0.071

1.220

1.811

0.866

88 Mullion

0.071

1.220

2.756

0.866

Door Sash

0.118

1.220

0.709

1.535

Retro Door Sash

0.118

1.220

0.945

1.535

Low Threshold

0.071

0.945

0.394

screens

Retractable screens are available for Modern Swinging doors and Multi-Slide doors. A sliding screen is available for the Modern Sliding door.

Screens Features

1. Slim screen frame designed to preserve sightlines and maximize daylight openings

2. Optional retractable screen system for swinging and multi-slide doors, featuring high-transparency mesh for unobstructed views

3. Premium high-visibility mesh for enhanced clarity and airflow

4. Sliding screen option available for sliding door systems, engineered for smooth operation and durability

5. Innovative latch system with interior color-matched finish for a clean, cohesive look

sills

Every detail of the ViewLux system is thoughtfully engineered, including the sill design. We offer flush sill options for both mild and demanding weather conditions, as well as a performance sill solution for applications where a recessed installation is not feasible.

Swinging Options

Low profile Threshold
Saddle Threshold