
SD 150
Element Panoramic Sliding Door

The ViewLux SD 150 Element Panoramic Sliding Door delivers expansive, uninterrupted views with large glass panels that glide smoothly and quietly. Designed for modern indoor-outdoor living, it fills spaces with natural light while maintaining excellent energy performance.
Its fully recessed track system is built to be integrated into the floor, creating a flush transition with both interior and exterior finishes. A concealed drainage system with pipe connection ensures proper water management, while the bottom track allows insertion of finish flooring for a clean, seamless look.
water proof
Heat Insulation
Prevent Mist
Airtightness
Sound Lock
Wind
Resistance
Detailed Images





Handle Options

OPTION 1

OPTION 2
Product Features
Ultra-Narrow Glazing Bead Design, Luxurious and Aesthetic, Expansive View and Space.
Reinforced Glazing Bead, Safe and Secure.
Sliding Hardware System with Optional Professional Anti-Theft Accessories.
One System with Multiple Opening Options.
Various Track Designs to Meet Different Scene Requirements.
Stainless Steel Lock Head, Keyed Glazing Bead Lock, Bead Lock
Adjustable Anti-Trip Guide Wheel
Clamp Type High Bearing Block
Specialty Glass Options

FROSTED

OBSCURE

BLACK TINT

GRAY TINT
Color
Premium Black
Pure White
Vintage Brown
Classic Grey
Luxury Silver

Teak Wood
Technical parameters
|
Profile Thickness (in) |
Glass Thickness (in) |
Sightline Width – Interior (in) |
Sightline Width – Exterior (in) |
|
|---|---|---|---|---|
|
150 Two-Track Frame |
0.079 |
1.378 |
1.378 |
|
|
150 Two-Track Top Track |
0.087 |
2.165 |
2.165 |
|
|
150 Two-Track Bottom Track |
0.079 |
1.969 |
1.969 |
|
|
150 Two-Track Low Track |
0.079 |
0.787 |
0.787 |
|
|
150 Three-Track Frame |
0.079 |
1.378 |
1.378 |
|
|
150 Three-Track Top Track |
0.087 |
2.165 |
2.165 |
|
|
150 Three-Track Bottom Track |
0.079 |
1.969 |
1.969 |
|
|
150 Three-Track Low Track |
0.079 |
0.787 |
0.787 |
|
|
150 Four-Track Frame |
0.079 |
1.378 |
1.378 |
|
|
150 Four-Track Top Track |
0.087 |
2.165 |
2.165 |
|
|
150 Four-Track Bottom Track |
0.079 |
1.969 |
1.969 |
|
|
150 Four-Track Low Track |
0.079 |
0.787 |
0.787 |
|
|
150 Sash Profile |
0.091 |
1.181 |
2.228 |
2.228 |
|
150 Bottom Sash Profile |
0.091 |
1.181 |
3.031 |
3.031 |
|
150 Top Sash Profile |
0.098 |
1.181 |
0.945 |
0.945 |
|
150 Meeting Stile |
0.118 |
1.181 |
0.945 |
0.945 |
screens
Retractable screens are available for Modern Swinging doors and Multi-Slide doors. A sliding screen is available for the Modern Sliding door.

Screens Features
1. Slim screen frame designed to preserve sightlines and maximize daylight openings
2. Optional retractable screen system for swinging and multi-slide doors, featuring high-transparency mesh for unobstructed views
3. Premium high-visibility mesh for enhanced clarity and airflow
4. Sliding screen option available for sliding door systems, engineered for smooth operation and durability
5. Innovative latch system with interior color-matched finish for a clean, cohesive look
sills
Every detail of the ViewLux system is thoughtfully engineered, including the sill design. We offer flush sill options for both mild and demanding weather conditions, as well as a performance sill solution for applications where a recessed installation is not feasible.

Sliding Options

