
Element PH 118
Hung/Double hung

Smooth-operating Element PH 118 double-hung windows offer flexible ventilation and timeless style. Perfect for bedrooms, living areas, and patio-facing rooms. Enjoy fresh air and easy maintenance without compromising energy efficiency or indoor comfort.
water proof
Heat Insulation
Prevent Mist
Airtightness
Sound Lock
Wind
Resistance
Detailed Images


Product Features
Precision engineered balance system ensures smooth operation and secure positioning at any height
Thermally efficient performance with dual-pane and triple-pane glazing options.
Classic hung window design provides flexible ventilation with operable upper and lower sashes.
Smooth vertical operation ensures easy and controlled opening and closing.
Modular design allows standalone installation or combination with other window and door systems.
Tilt-in sash design allows safe and convenient cleaning from inside the home.
Available in contemporary finishes with customizable interior and exterior color options.
High-performance factory finish resists scratching, marring, and fading.
Specialty Glass Options

FROSTED

OBSCURE

BLACK TINT

GRAY TINT
Color
Premium Black
Pure White
Vintage Brown
Classic Grey
Luxury Silver

Teak Wood
Technical parameters
|
Profile Thickness (in) |
Glass Thickness (in) |
Sightline Width – Interior (in) |
Sightline Width – Exterior (in) |
|
|---|---|---|---|---|
|
118 Left/Right Guide Rail |
0.067 |
2.126 |
2.913 |
|
|
118 Bottom Frame |
0.067 |
2.756 |
0.787 |
|
|
118 Top Frame |
0.067 |
2.205 |
2.205 |
|
|
118 Window Sash |
0.071 |
0.984 |
1.457 |
1.457 |
screens
Engineered for crank-operated, push-out, and automated ViewLux casement and awning window configurations.

Screens Features
1. Slim screen frame designed to preserve sightlines and maximize daylight openings
2. Optional retractable screen system for swinging and multi-slide doors, featuring high-transparency mesh for unobstructed views
3. Premium high-visibility mesh for enhanced clarity and airflow
4. Sliding screen option available for sliding door systems, engineered for smooth operation and durability
5. Innovative latch system with interior color-matched finish for a clean, cohesive look
