Gasket vs. Sealant Glazing: Dry and Wet Glazing Compared

Gasket glazing (dry glazing) holds glass in the frame with a pre-formed rubber strip under compression. Sealant glazing (wet glazing) bonds and seals the glass with a gunned-in sealant that cures in place. Neither is better in every case. Dry glazing installs quickly from the interior and depends less on weather and workmanship. Wet glazing gives a continuous seal with strong water and air resistance, but it needs exterior access and careful site conditions. The right choice depends on the assembly, the exposure, the loads and the manufacturer’s system instructions.

This guide is written for architects, builders, contractors and homeowners specifying custom aluminum windows and doors. It explains how each method works, where each fits, what the research and U.S. industry bodies say about corners, drainage and compression, and what to confirm on a quote.

Viewluxwindows
Specify Custom Aluminum Windows With Confidence
Viewlux manufactures custom aluminum windows and doors with NFRC and AAMA certifications for projects shaped by modern architectural designs.

Explore Viewlux Windows

TL;DR

  • A glazing gasket is a pre-cured elastomer strip that seals by compression. Wet glazing uses sealant applied from a cartridge or sausage and cured in place.
  • Dry glazing can be installed from the interior and relies less on weather and workmanship. Wet glazing needs exterior access and forms an uninterrupted seal.
  • Gasket corners are the most common weak point. Molded corners outperform field-cut joints, and drainage must be kept open in either method.
  • Many systems combine both: a dry gasket on one side of the glass and a wet seal on the other.
  • Follow the system manufacturer’s instructions, and ask for the glazing method, gasket material and drainage path in writing before ordering.

Table of Contents

What gasket glazing and sealant glazing actually are

Both methods do the same job. They hold the glass unit in the frame, keep air and water out, and let the glass and aluminum move at different rates as temperatures change. They do it in different ways.

Gasket (dry) glazing

A glazing gasket is a pre-cured, extruded elastomeric strip, commonly EPDM, silicone or PVC, that seals through compression against the glass and the frame. Because it is already cured, it seals the moment it is seated. There is no waiting period for the material to set, which is one reason dry glazing is popular in factory-glazed and fast-moving installations.

Gaskets come in several profiles. Wedge gaskets are pressed into a channel between the glass and frame. Bubble or captive sections stay in a groove in the frame. The profile has to match the frame’s glazing pocket and the thickness of the glass unit, which is why gaskets are specified as part of the window system rather than picked separately.

Sealant (wet) glazing

Wet glazing applies sealant, typically silicone, from a cartridge or sausage with a caulking gun. According to a glazing brochure from a sealant manufacturer, dry glazing uses pre-formed solid rubber seals, while wet glazing gives an uninterrupted seal with high resistance to water and air penetration. The same source notes that a wet seal acts as an adhesive, which limits glass movement, often called glass walk.

Sealant (wet) glazing

The difference between sealing and bonding matters. The National Glass Association points out that sealants act as barriers against air and water, while adhesives hold materials together. One material can do both jobs, but the specification should state which job it is expected to do.

Dry glazing vs. wet glazing at a glance

Factor Gasket (dry) glazing Sealant (wet) glazing
Material Pre-formed EPDM, silicone or PVC strip Sealant gunned in and cured on site or in the shop
How it seals Compression against glass and frame Continuous bead that adheres to glass and frame
Curing None, seals on installation Requires curing time
Access Can be installed from the interior Needs exterior access
Dependence on weather and workmanship Lower Higher, sensitive to site conditions
Water protection of the glazing pocket Joints at corners can be vulnerable Better protection against infiltration
Glass movement Controlled by compression and blocks Adhesion limits glass walk
Typical weak point Gasket shrinkage, aging, corner gaps Poor adhesion or incomplete bead

The installation and workmanship points come from the sealant manufacturer’s glazing brochure. The water-infiltration and weak-point points come from a U.S. glazing contractor’s article on wet glazing, which found that wet glazing protects the glazing pocket better than gasket systems with vulnerable corner joints.

Where each method is used

Residential and light commercial aluminum windows are commonly gasketed, because factory glazing with compression gaskets is repeatable and fast. Wet sealing shows up where a continuous seal is worth the extra labor: exterior perimeters, structural glazing, and joints between the frame and the surrounding wall.

Curtain wall shows how often the two are combined. A Canadian curtain wall guide explains that curtain walls commonly use a dry gasket on the inside and a wet seal on the outside because it is practical for installing insulating glass units. Some systems use dry on both sides. The same page identifies a wet seal on the inside with a dry gasket outside as the preferred arrangement for performance and durability. In other words, the choice is rarely all or nothing. It is about which side of the glass gets which seal.

For readers comparing system types, Viewlux explains how window wall differs from curtain wall and how the frame mounting method changes where water is controlled in its guide to nail fin vs. block frame.

Does a gasket need sealant on both sides?

Not always, but sometimes. The German glazing guideline from the flat glass association states that gaskets need not always seal on both sides. In weather-exposed or high-humidity applications, and where dynamic stresses act on the glazing, the weather seals must be continuous on both sides. It also stresses following the manufacturer’s instructions and preserving drainage and pressure equalization.

This is the practical answer to a question that comes up often on job sites: do not add sealant to a gasket system unless the system instructions call for it. Extra sealant can block the drainage path or interfere with how the gasket is meant to compress.

Performance factors that decide the choice

The National Glass Association’s design guidance lists the factors that should drive selection: humidity, temperature and temperature variation, durability and service life, material compatibility, and dead, wind, snow and live loads. Applied to a real project, that translates into five questions.

  1. Exposure. Is the opening on a coastal, high-wind or heavy-rain elevation? Harsher exposure raises the value of a continuous seal and a well-detailed drainage path.
  2. Glass type. Coated, laminated and insulated glass units can react with some sealants. Compatibility has to be confirmed with the sealant and gasket makers, not assumed. Viewlux covers related glass choices in its pieces on energy efficient glazing options and insulated laminated glass.
  3. Loads. Large panels in panoramic sliders and wall systems see higher wind and dead loads, which affects both the glazing method and the blocking.
  4. Service life and maintenance. Gaskets can shrink or age. Sealants can lose adhesion. Either way, the plan should include inspection.
  5. Schedule and access. Interior-installed dry glazing suits upper floors and tight schedules. Wet glazing requires exterior access and weather windows.

Corners, drainage and blocking: where glazing fails

Most glazing problems are not about gasket versus sealant. They come from details around the seal.

Gasket corners

SCGMA technical guidance identifies corners as the most vulnerable areas for water and air intrusion in gasketed systems and recommends molded corners over field-cut joints. A glazing contractor’s article adds that gasket shrinkage, aging or improper installation, especially gaps at sill and jamb corners, can cause infiltration. It recommends mock-ups and pre-job adhesion tests for wet-sealed work.

Drainage and pressure equalization

No glazing seal is perfect, so the system must let water out. Proper glazing needs an adequate weep system or moisture-repellent materials for drainage and pressure equalization, which prevents premature failure of glass units. AGC’s glazing guidance makes the same point from the durability side: the system should ensure air tightness from inside to outside and watertightness from outside to inside, supported by effective drainage.

Weep holes are part of that system, and they clog. Viewlux’s guidance on weep hole maintenance and its note on flush sill drainage specs cover how drainage is tested and kept open.

Setting blocks and anti-walk blocks

The seal does not carry the weight of the glass. Blocks do. Anti-walk blocks limit glass movement caused by wind loads, seismic activity or thermal expansion. Shop drawings should specify glazing accessories such as setting blocks and edge blocks and clearly show water drainage paths and sealant continuity.

U.S. standards that apply

Three references come up most often on U.S. projects.

Certification adds another layer. NFRC ratings describe a product’s thermal performance, and AAMA certification addresses performance testing. Both belong in the submittal package next to the glazing details.

A practical checklist before you order

Use this list when reviewing a quote or a submittal for any aluminum window or door system.

  1. Glazing method in writing. Ask whether the unit is gasketed, wet-sealed, or a combination, and which side of the glass gets which.
  2. Gasket material and standard. EPDM, silicone or another elastomer, with the ASTM reference.
  3. Corner construction. Molded corners or field-cut joints, and how corner joints are sealed.
  4. Drainage path. Where water enters the glazing pocket, where it exits, and how pressure is equalized.
  5. Blocking. Setting block and anti-walk block placement.
  6. Sealant compatibility. Confirmation from the manufacturer that sealants suit the glass coating, the interlayer and the insulating unit’s edge seal.
  7. Testing and mock-ups. Pre-job adhesion tests for wet seals, and a mock-up for large or complex openings.
  8. Maintenance plan. Who inspects gaskets and sealant joints, how often, and what the replacement procedure is.

An architect or building envelope consultant should sign off on glazing details for commercial, multi-family or high-exposure projects. Local code and the project’s engineer of record decide the final requirements.

Our perspective

Glazing is decided early, long before the window arrives. On every project, the questions that matter are the same: what seals the glass, where does water go when it gets past the first line, and who can see the details before the order is placed.

We build custom aluminum windows and doors that are designed to hold up to demanding climates, and our 26-step production process is built around controlling those details in the factory, not improvising them on site. Factory production gives the glazing method, the corner construction and the drainage path a consistent, documented starting point.

Because we sell direct from the factory, architects, builders and homeowners can talk about glazing details with the people who manufacture the system. Our NFRC and AAMA certifications give specifiers a performance baseline to review. We encourage every buyer to ask for the glazing details in writing, and we are glad to walk through them.

Liran

Specifying custom aluminum windows and doors with Viewlux

Viewlux manufactures custom aluminum sliding, casement, awning, fixed and hung windows, along with swing, bifold, pivot and heavy-duty sliding doors and glass railing systems for residential and commercial projects. Direct-to-consumer sales are designed to save buyers up to 50% compared with traditional dealers, and products carry NFRC and AAMA certifications. Browse the full window and door catalog to match a product line to the opening, then request a quote with your glazing requirements attached.

Viewluxwindows

For casement and awning projects, the Element 150 casement wall system and Element 150 awning wall system are good starting points for large-format openings. Buyers choosing between operating types can compare casement vs. sliding windows on NFRC performance. Viewlux has showrooms in California, Colorado and Nevada.

FAQ

What is the difference between dry glazing and wet glazing?

Dry glazing uses a pre-formed rubber gasket that seals by compression. Wet glazing uses sealant applied with a caulking gun that cures in place. Dry glazing can be installed from the interior and is less dependent on weather and workmanship. Wet glazing needs exterior access and forms a continuous seal.

Do you put sealant on both sides of a glazing gasket?

Only when the system requires it. Industry guidance says gaskets need not always seal on both sides, but weather-exposed, high-humidity or dynamically stressed applications need continuous weather seals on both sides. Follow the manufacturer’s instructions and keep drainage paths open.

Which is more weather-tight, a gasket or a sealant?

A continuous wet seal provides better protection against water getting into the glazing pocket, because gasketed systems can have vulnerable joints at the corners. A well-made gasket system with molded corners and working drainage can still perform well when installed per the manufacturer’s instructions.

Can gaskets and sealants be used together?

Yes. Curtain wall systems commonly pair a dry gasket on one side of the glass with a wet seal on the other. The arrangement should come from the system designer, and the sealant must be compatible with the gasket and the glass.

What should I ask a window supplier about glazing?

Ask for the glazing method, the gasket material and its ASTM reference, corner construction, the drainage path, blocking details and the NFRC and AAMA documentation. Having these in writing before the order avoids surprises at installation.