Prioritize OITC for exterior windows and STC for interior partitions. ASTM E1332 governs OITC calculations, while ASTM E413 governs STC, and the difference comes down to frequency: OITC weights the low-end rumble of traffic, aircraft, and rail that STC largely ignores. Viewlux Windows & Doors builds to both standards, but for a window facing a road or flight path, OITC is the number that predicts what you’ll actually hear inside.
TL;DR:
- OITC ratings better predict real-world exterior noise performance, especially for transportation sounds, because they account for low-frequency noise ignored by STC.
- For sites near highways or railroads, target OITC 35 or higher, as standard ratings often underestimate actual noise levels transmitted through windows.
- Selecting the correct rating depends on the noise source: use STC for interior activities and OITC for exterior transportation noise, with both specified in mixed environments.
- Improving OITC performance involves laminated glass, wider airspaces, asymmetrical glass thickness, and airtight installation, rather than just adding glass layers.
- Always request manufacturer-provided lab OITC reports and raw data, especially for noise-critical projects, to accurately compare performance against site-specific noise conditions.
Table of Contents
- STC vs OITC Windows: What Each Rating Measures
- STC vs OITC Differences That Change Your Spec
- How to Choose Which Rating to Prioritize for Your Project
- Typical STC and OITC Ranges for Common Window Assemblies
- Practical Ways to Improve Window Acoustic Performance
- How Viewlux Approaches Acoustic Glazing
- Get Windows Built for Your Actual Noise Problem
- Sources
STC vs OITC Windows: What Each Rating Measures
Sound Transmission Class covers a frequency range of 125 to 4,000 Hz, tested under ASTM E413 using the ASTM E90 test method. That band matches human speech almost exactly, which is why STC has dominated interior wall and door specifications for decades. It tells you how well an assembly blocks a conversation, a barking dog, or a television through a shared wall.
Outdoor-Indoor Transmission Class runs from 80 to 4,000 Hz, governed by ASTM E1332. Those extra 45 Hz at the bottom end matter more than they sound like they should, because that’s exactly where highway noise, jet engines, and freight rail live. A window can post a respectable STC and still let a surprising amount of truck noise through, simply because STC’s test spectrum never asks the question.
Both ratings compress a full acoustic performance curve into one number, and that’s their biggest limitation.
- STC and OITC each average transmission loss across their frequency bands into a single digit
- A single number can mask poor performance at specific frequencies, especially below 100 Hz
- When a project involves a narrowband noise source (a specific train frequency, for instance), a one-third-octave band analysis of the raw transmission loss data gives a far more accurate picture than either single-number rating alone
STC vs OITC Differences That Change Your Spec
The fastest way to decide which rating to chase is to identify the noise source. Speech and interior activity call for STC. Transportation noise, the kind that rattles a bedroom window near an arterial road, calls for OITC.
- Speech, TV, interior activity → specify STC for demising walls, interior partitions, and doors between rooms
- Highway, aircraft, or rail noise → specify OITC for any window or façade assembly exposed to that noise source
- Mixed environments (urban apartment above a busy street) → specify both, with separate minimums for the window and the interior wall
OITC readings typically run several points lower than STC for the same assembly, because standard glass performs worse at low frequencies than it does in the speech range. That gap isn’t a manufacturing flaw. It’s a physical property of glass mass and stiffness at frequencies below 250 Hz, and it’s why OITC better predicts real-world exterior noise performance than STC does for the same product.
The number that changes specs: a large-dataset comparison of the two metrics found STC and OITC correlate only loosely, and recommended OITC specifically when facades face transportation noise. There’s no reliable formula to convert one rating into the other. If a manufacturer hands you an STC number for a window destined next to a freeway, ask for the OITC report, or request the raw one-third-octave band data so an acoustician can evaluate the low end directly.
How to Choose Which Rating to Prioritize for Your Project
Start with a five-minute site survey before you touch a spec sheet. Stand at the window location and note the dominant noise: traffic hum, occasional jet flyovers, a nearby rail line, or mostly interior household sound. Distance and line of sight to the source matter almost as much as the source itself.
- Quiet suburban site, no major roads nearby: target OITC in the 22–28 range
- Urban site near an arterial road: target OITC at a level appropriate for typical urban traffic noise
- Highway frontage, rail corridor, or flight path: target OITC 35 or higher, and treat this as a floor, not a ceiling
- Any project with a narrowband or unusually low-frequency source: loop in an acoustician before finalizing glass specs
When you request test data from a manufacturer, ask for the lab OITC report number and test date, the IGU construction details (glass thickness, airspace, interlayer type), any field test notes, and the seal and installation requirements the lab tested against. A sound design guide from Pabco Gypsum warns that older test reports can overstate real-world performance, since flanking paths and field installation quality routinely erode lab numbers.
Pro Tip: If a quote sheet lists only STC for a window that will sit within a few hundred feet of a highway or runway, that’s a red flag. Ask directly for the OITC number before you sign off on glass.
Typical STC and OITC Ranges for Common Window Assemblies
Component choices shift both ratings, but not by the same amount. Laminated glass and asymmetrical pane thickness tend to move OITC more than STC, because the damping interlayer specifically targets the low frequencies STC never tests.
| Assembly Type | Typical STC Range | Typical OITC Range |
|---|---|---|
| Standard double-pane IGU | 28 | 22–26 |
| Laminated double-pane IGU | 35–37 | 28–31 |
| Triple-pane laminated | 39–41 | 33–35 |
A common entry-level combo, 3mm glass paired with 3mm glass across a 12mm airspace, lands around STC 26–30 and OITC 22–26. Widening that airspace or swapping in a laminated pane raises both numbers, but the OITC gain is usually the larger one.
- Thicker glass adds mass, which helps mid and high frequencies more than the low end
- Wider airspace between panes reduces resonant coupling, benefiting OITC specifically
- Asymmetrical lite thickness (one pane thicker than the other) prevents both panes from resonating at the same frequency, which closes gaps in the curve that matched-thickness IGUs tend to have
Practical Ways to Improve Window Acoustic Performance
Raising OITC on an existing window design rarely means starting from scratch. A handful of proven measures move the number without a full frame redesign.
- Laminated glass with a PVB interlayer damps low-frequency vibration directly, which is the single most reliable lever for OITC gains
- Asymmetrical pane thickness avoids coincident resonance, where matched panes vibrate in sync and cancel out the benefit of the second layer
- Wider IGU airspace (generally 1/2 inch or more) reduces the spring effect between panes; too narrow a gap can nullify the benefit entirely
- Acoustic inserts or storm panels add a third glazing layer as a retrofit option for existing frames
- Upgraded seals and airtight installation close flanking paths that undercut even a well-rated assembly once it’s actually installed
Frame mass matters too, but heavier frames often mean thicker aluminum profiles, which can affect thermal performance if not engineered carefully. For meaningful low-frequency gains, a damped interlayer and increased cavity depth typically need to work together. A tiny gap increase alone can be undone by coincident resonance between two panes of equal thickness. Reviewing glazing options that balance thermal and acoustic performance before finalizing a spec avoids that trade-off entirely.
Pro Tip: Don’t chase OITC gains by adding glass layers alone. A poorly sealed frame around a high-performance IGU will leak more sound than a modest upgrade in a truly airtight installation.
How Viewlux Approaches Acoustic Glazing

Viewlux Windows & Doors builds every window through a 26-step production process with NFRC and AAMA certifications backing the finished product. That factory control matters more for acoustic performance than most buyers realize: IGU assembly, seal quality, and glazing bead fit all happen under consistent conditions, not on a jobsite where humidity, dust, and rushed schedules routinely undercut a lab-tested assembly.
Custom laminated and asymmetrical IGU configurations get built to the same tolerances every time, which is the variable that separates a window that performs like its test report from one that falls short once installed. Readers specifying for a transportation-noise site can request Viewlux lab test data directly to compare against project targets, including multifamily-specific acoustic guidance for shared-wall and façade scenarios.
— Liran
Get Windows Built for Your Actual Noise Problem
Viewlux Windows & Doors supplies custom laminated and asymmetrical IGU configurations with lab-tested OITC and STC data, so you’re specifying against real numbers instead of a manufacturer’s best guess.

Every quote request can include a sample spec sheet, the relevant lab test report, and pricing built around your project’s exact noise exposure, whether that’s a suburban remodel or a high-rise facing a rail corridor. Explore the energy-efficient glazing options available through Viewlux’s direct-to-consumer model, which cuts out traditional dealer markups on custom aluminum systems. If your project needs field-level noise data before you finalize a spec, a step-by-step noise analysis workflow can help pin down the exact frequencies you’re designing against. Request a quote and lab test report today to see how a factory-direct acoustic glazing package compares to what you’re currently being quoted.
Sources
Before finalizing any acoustic window spec, verify the numbers against these references:
- ASTM E1332-22
- Comparison of Sound Transmission Class and Outdoor-Indoor Transmission Class for specification of exterior facade assemblies — DOI paper
Always ask manufacturers for the lab report number and test date behind any rating they quote.
