Weep holes are small openings at the bottom of a window frame that let trapped water drain outside, so never seal or paint over them. Your fastest check is simple: pour a little water into the track and watch the exterior opening. If it doesn’t exit, clear the blockage. If cleaning doesn’t restore drainage, the flashing or sill pan may be the real problem.
TL;DR:
- Vacuum the track, pour in a small glass of water, and expect it to drain outside within moments; stop if water overflows indoors.
- Clear blockages gently with a brush or pipe cleaner, pulling debris outward; never widen slots, use a pressure washer, or seal openings.
- Check weep holes once or twice yearly, before rainy seasons, after exterior work, and after leaf season beneath overhanging trees.
- If water persists after cleaning, check the sill slope, staining, soft wood, or rot; document findings and contact a qualified installer rather than opening walls.
Table of Contents
- How do you find and inspect your weep holes?
- How do you test whether a weep hole is draining?
- What is the safest step-by-step way to clean clogged weep holes?
- What tools and safety gear do you need?
- How often should you check weep holes?
- What does it mean when cleaning doesn’t fix standing water?
- Why I treat weep holes as the start of the diagnosis, not the whole fix
- Is a replacement window the better route for repeated problems?
- FAQ
- Sources
How do you find and inspect your weep holes?
Exterior weep holes appear as small openings or slits along the bottom edge of the window frame. They are built to let water that gets past the glazing seal or into the track escape outdoors, and they should never be blocked, painted over, or caulked. On the inside, the matching drain paths run beneath the track, and some are visible in the sash or sill channel.
Start outside, then check inside. Look for:
- Slot openings along the bottom of the frame, usually near each end of the window.
- Paint or caulk bridging the opening, common after exterior repainting or sealing jobs.
- Trapped debris such as leaves, grit, spider webs, or insect nests packed into the slot.
- Dirt buildup in the interior track that sits directly above the drain path.
If a sash blocks your view of the track, many sliding and casement sashes can be tilted or lifted out following your manufacturer’s instructions. Do only what the manual allows, and stop if a part resists. A flashlight helps you see whether the channel is clear or packed solid.
How do you test whether a weep hole is draining?
Two quick tests tell you most of what you need to know. Pouring water into the track is the standard homeowner check.
- Vacuum loose dirt from the track so debris doesn’t skew the result.
- Pour a small glass of water slowly into the interior track.
- Watch the exterior weep hole. Water should exit within moments.
- If the exit is slow or dry, mist the exterior with a spray bottle or a gentle, low-pressure garden hose to see where water enters and stalls. Never use a pressure washer.
- If water flows freely, the drainage path is working. If not, clean lightly and retest.
Water that backs up and overflows into the room is a stop sign. Mop it up and move on to the cleaning steps below.
What is the safest step-by-step way to clean clogged weep holes?
Work from large debris to small, and always pull material out rather than pushing it deeper into the channel.
- Clear the track. Vacuum loose dirt and leaves with a narrow nozzle, then wipe the sill with a damp cloth and mild soap.
- Loosen the blockage. Slide a flat screwdriver or putty knife gently into the weep opening and draw debris outward.
- Clean the channel. Run a straw brush, pipe cleaner, or small drain brush through the slot. Repeat from the interior and the exterior where you can reach both.
- Blow it out. Use compressed air from the interior side so debris is driven toward the exterior opening.
- Remove covering caulk. If sealant bridges the slot, slice it away carefully with a putty knife. Mineral spirits or isopropyl alcohol can soften some sealants, but test a hidden spot of the finish first.
- Retest. Repeat the pour test. If water still stalls, go through the steps again.
Pro Tip: Wrap a pipe cleaner around the tip of a thin tool and work it in a gentle in-and-out motion. Aggressive scrubbing or widening the slot can reverse its function and invite water into the assembly.
Keep the opening its original size. Guidance for wall systems calls for weep holes at least 3/16 inch (5 mm) in diameter, spaced less than 33 inches (840 mm) on center, so a slot that looks tiny is often working as designed.

What tools and safety gear do you need?
Gather everything before you start so you aren’t improvising with a screwdriver that scratches the finish.
- A vacuum with a narrow crevice nozzle
- A soft straw or bottle brush and a few pipe cleaners
- A small flathead screwdriver or plastic putty knife
- A can of compressed air
- Mild, nonabrasive soap and a clean cloth for the track
- Solvent such as mineral spirits only for stubborn caulk, used per the manufacturer’s guidance
- Eye protection, since debris and air can fly back at you
- A stable ladder for upper-story or high exterior work, set on level ground
Skip the pressure washer entirely. High-pressure water can force moisture into the frame and wall instead of letting it drain out.
How often should you check weep holes?
Windows are part of a drained system that includes sloped sills and flashings, and that system only works while the drainage pathways stay clear. A simple routine keeps them that way:
- Check at least once or twice a year, and always before your rainy season or a forecast storm.
- Re-inspect after painting, new siding, roofing work, or any exterior job that could cover the openings.
- Add a drainage retest to routine window cleaning: vacuum the tracks, rinse lightly, and pour a little water through.
- Look again after leaf season if trees overhang the house.
A brief check per window, repeated regularly, is usually all it takes.
What does it mean when cleaning doesn’t fix standing water?
A clean weep hole that still holds water points to a problem deeper in the wall. A pan flashing collects water below a window and must drain to the exterior; a badly installed or sealed bottom flange can trap water instead. Our guide on sill pans versus weep holes shows how the two work together.
Quick checks before you call anyone:
- Look for staining, soft wood, or rot at the trim and sill.
- Check whether the sill slopes outward rather than holding water.
- Note whether moisture seems to come from inside the wall cavity.
- Write down your test results and take photos of each step.
Don’t open walls or tear out trim yourself. Hand your notes to a qualified installer or contractor. Our walkthrough on flashing an aluminum window system correctly is a useful reference to share with them, and window rehabilitation guidance lists inspection steps for tracing water and air infiltration.
Why I treat weep holes as the start of the diagnosis, not the whole fix

Most advice treats a clogged weep hole as the villain. In my view it’s usually the messenger. A blocked slot is easy to blame, and easy to clear, which is why people stop there. But when water keeps returning after a clean test, the drain was only exposing a flashing or sill problem that cleaning cannot touch.
My rule: do the simple tests and gentle cleaning first, and never use methods that force water into the assembly. Renters should report persistent leaks to maintenance rather than experimenting. Owners should document everything and escalate early, because rot grows quietly.
— Liran
Is a replacement window the better route for repeated problems?
If leaks, rot, or failing flashing keep returning, repeated cleaning is only managing a symptom. A replacement system with correct pan flashing and clear drainage details can cut that maintenance down.

We build custom aluminum windows and doors, and everything we make is NFRC and AAMA certified. Here is what we offer readers facing recurring drainage trouble:
- Factory-direct aluminum systems, from sliding windows to casements and doors, in our full catalog
- Flush-sill drainage details explained in our sill drainage specs
- Showrooms in California, Colorado, and Nevada where you can talk through a long-term replacement
Browse the catalog or visit a showroom to start the conversation.
FAQ
What does a weep hole look like on a window?
It is a small slot or round opening along the exterior bottom edge of the frame. Weep holes appear as small openings or slits that let water escape, and some windows have a matching cover or flap on the outside.
Can water enter through weep holes?
Weep holes are built to push water out, but a strong wind-driven rain can occasionally force a little back in. Keeping the channel clean and the opening unobstructed lets that water drain right back out.
Are weep holes necessary in windows?
Yes. Weep holes are an essential part of a drained system, and sealing them traps moisture that can lead to rot and early failure. Leave them open and clear.
How do you drill weep holes in a window?
Don’t improvise this one. Drilling or widening openings can reverse a weep hole’s function and let water into the assembly. If your window has none, ask the manufacturer or a qualified installer to advise.
Sources
- Clean Window Weep Holes | Building America Solution Center
- Design and Construction of Low-Rise Frame Building Wall Systems to Resist Water Intrusion
- Maximize Window, Door & Skylight Lifespan | FGIA
- How to Maintain Window Weep Holes
